Vesgantti Folding Mattress with Storage Bag, 15cm Gel Memory Foam Tri-Fold Mattress for Travel, Camping & Guest Bed CertiPUR-US Certified, Grey

£159.99
Liquid error (snippets/product-form line 139): Computation results in '-Infinity' (Save£-159.99)
Voucher
An extra £90.00 OFF with code Apply £90.00 voucher
Code: £90 OFF
Discount price: £69.99

Please use the code at checkout.

Smart Tri-Fold Design & Easy Storage- The Vesgantti folding mattress features a space-saving tri-fold design with a convenient carry handle for effortless storage and transport. Perfect for guest rooms, camping, travel, or small living spaces, it folds neatly into a compact size that fits easily in a closet or car trunk

Premium Comfort & Reliable Support- Built with a dual-layer structure for superior comfort and support: a 3 cm soft, cooling memory foam layer gently contours to your body, while the 12cm high-density support base evenly distributes weight, relieves pressure points, and promotes deep, restful sleep

Soft, Skin-Friendly & Non-Slip Fabric- The premium fabric is soft, breathable, and gentle on the skin, offering a cozy and supportive sleeping surface. The non-slip bottom design keeps the mattress securely in place during use, ensuring stability and safety on any floor

Removable & Washable Cover - Easy Maintenance- Designed for hassle-free cleaning, the zippered cover is fully removable and machine washable, making it easy to keep your mattress fresh and hygienic. The inner mattress can also be wiped clean for daily maintenance

Versatile for Home & Outdoor Use- Ideal as a guest bed, floor mattress for playrooms, temporary bed during renovations, or for outdoor adventures such as camping, road trips, and picnics. Its versatility makes it an essential addition to any home or travel setup

Ships FREE, arriving in 3-5 business days

See why customers love the Vesgantti products

Write a review

Write a review

  • {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content | ellipsis }}

    Continue Reading
    {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content }}

    All Reviews

    All Reviews

    {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content }}

    Customer Reviews

    Based on 2 reviews
    100%
    (2)
    0%
    (0)
    0%
    (0)
    0%
    (0)
    0%
    (0)
    T
    Tammy Louise
    Absolutely brilliant

    Cannot fault this matress at all. It's extremly comfortable and very easy to fold up and pop back in its bag. I use it every night and it's honestly as comfortable as a regular mattress. You'd never know that it's a fold up.

    M
    Matt Henderson
    Too good to be true - my experience

    Amazing product - just want to say thank you for the quick shipping and the first night's sleep.

    First lying down on the mattress, I was a little emotional: due to my condition, my wife and I sleep apart, and my apart has always been the sofa - this bed is so comfortable I couldn't believe it.

    I've had cheap foldouts before, avoided them specifically because of everything this bed is not, and resigned myself to the sofa years hence.

    The Vesgantti Premier is not cheap (but is IS amazing value), and at this price point, I am absolutely confident it is the best looking, most comfortable folding bed money can buy.

    Really sturdy construction, good quality materials, and it looks premium, exactly as labelled.

    Here's to the first of many comfortable nights - cheers!