Vesgantti 2021 Version Hybrid Mattress-24cm

£162.99 £330.99
51%OFF (Save£168.00)
Voucher
An extra £25.00 OFF with code Apply £25.00 voucher
Code: 25code
Discount price: £137.99

Please use the code at checkout.

  • 【Perfect Sleeping Surface】- Luxury mattress cover is enriched with Argentum Fabrics to provide a natural antibacterial property. To give you a healthier sleeping surface, our removable silver ion cover is in a upgraded washable version. And thanks to the inner 3D mesh cover, moisture can be quickly absorbed and dissipated
  • 【Different Foam Layers】- 3CM Egg Crate Memory Foam and 3CM Flat Foam Layer not only promote air circulation with reducing heat, but also effectively absorb noise and vibration caused by moving. Vesgantti memory foam mattress can relax your body from the fatigue of the day by providing extra comfort so that you can enjoy a peaceful and comfortable night
  • 【Suitable For All Sleepers】- Vesgantti Sprung Mattress with 19cm pocket springs supports different parts of the mattress independently, ensuring you can sleep in any position with targeted support and keeping your spine balanced and positive at night
  • 【100-Nights Trial】- Vesgantti knows that your body may need 4 weeks to get used to a new mattress, so we give you 100 nights to see if it is the right mattress for you. Order it now with free shipping and try your Vesgantti king size mattress at home
  • 【Mattress-in-a-Box】- Vesgantti pocket sprung mattress arrives in a well-packed box, you can easily move it and set it up in your room. The new king size spring mattress will inflate in 10 seconds after unpacking but please allow 72 hours for it to fully expand

Ships FREE, arriving in 3-5 business days

  • 100-night
    risk-free trial

  • Free shipping
    in a box

  • Honest materials
    No Toxic

  • 10-Year
    Limited Warranty

    Best Prices, Best Service,
    Best Mattress

    for a limited time, you can get a free gift.
    Get a good night‘s sleep with a Vesgantti Mattress today.

    Enjoy a Silver Touch of Comfort

    Enjoy a Silver Touch of Comfort

    Vesgantti Argentum Mattress is weaved 3 graceful waves of silver threads in its cover. As a natural antibiotic, silver ions on the threads endow this mattress with excellent antibacterial, moisture wicking, anti-odour, anti-static and fire-resistant properties.

    Vesgantti Argentum Hybrid Mattress

    Vesgantti Argentum Hybrid Mattress

    We combine different foam layers and hundreds of pocket springs to support your every night’s sleep. The combination is designed to provide excellent back support and ideal comfort to your body.

    The mattress cover is enriched with Argentum Fabrics, which contain a natural antibacterial property that optimize the effect of moisture wicking and significantly inhibit the growth of bacteria.

    Moreover, a durable minuscule silicone layer is applied to the luxury mattress cover to ensure a long-lasting pleasant touch and the maximum softness of your mattress.

    BEKAERT DESLEE
    BEKAERT DESLEE

    Argentum Fabrics are supported by BEKAERT DESLEE, the world’s leading specialist in the development and manufacturing of mattress textiles, mattress covers

    CertiPUR-US
    CertiPUR-US

    Our foam layers have been certified by CertiPUR-US, we know that a high-quality and safe mattress is particularly important for the health of you and your family

    OEKO-TEX STANDARD 100
    OEKO-TEX STANDARD 100

    Vesgantti Argentum mattress has passed OEKO-TEX STANDARD 100 test, which means harmful substances in the mattress are effectively filtered before leaving our factory

    Argentum Fabrics Cover
    Argentum Fabrics Cover

    Silver ions effectively protect your mattress from dust particles and germs that can cause allergies

    Memory Foam Layers
    Memory Foam Layers

    Memory Foam moulds to your body shape and provides you with the most comfortable night's rest

    Individual Pocket Springs
    Individual Pocket Springs

    Every pocket spring independently supports specific part of the mattress with less movement transfer

    Washable Property

    Argentum Fabrics Cover is designed with a zipper for easy removal and washing. This silver ions cover is in a upgraded washable version.

    Anti-odour Property

    3D mesh inner cover can absorb and diffuse moisture (such as sweat) to keep your skin dry and comfortable.

    Antibacterial Property

    The silver component can effectively inhibit the bacteria on the mattress and will not affect the natural balance of your skin.

    Flame-retardant Property

    Vesgantti Argentum Mattress with flame retardant yarns can increase safety to diminish risks and dangers.

    See why customers love the Vesgantti mattress.

    Write a review

    Write a review

    • {{ item.author }}

      {{ item.time }}

      {{ item.title }}

      {{ item.content | ellipsis }}

      Continue Reading
      {{ item.author }}

      {{ item.time }}

      {{ item.title }}

      {{ item.content }}

      All Reviews

      All Reviews

      {{ item.author }}

      {{ item.time }}

      {{ item.title }}

      {{ item.content }}

      Customer Reviews

      Based on 4 reviews
      75%
      (3)
      0%
      (0)
      25%
      (1)
      0%
      (0)
      0%
      (0)
      G
      George
      Single mattress

      Bought this as a spare but have been using it as it’s so comfortable and I’m getting a good nights sleep,
      Would definitely recommend.

      C
      Charlotte
      A good choice if you’re on a budget

      Feels comfortable. Reasonable in price.
      Firm. A good enough buy if you are wanting an economical choice.

      A
      Amelia
      Very comfortable Matress

      It arrived a day later than was expected,but it's a great value matress for the price paid. It was easy to open and the matress springs to life ,I left it from the we'd to the friday before actualy using it,to give it time to fully expand. It has a removable cover,which when needed to can be taken off and washed in the washing machine,this is so good that you are able to do this when needed. The matress is great,so comfortable nice and firm but not to hard it supports your spine well,and you do get a great comfortable night's sleep.its just as comfortable as a silent night or dreams,or other well made mattresses I've purchased before. If your thinking of buying this mattress, I can reccomend it. And there is absolutely no smell to this matress when inboxes,as I'd read on other reviews this can happen with boxed matresses.

      J
      Jelena Klimenko
      The quality is average.

      When I ordered this mattress, I thought it would be the same as my son's.. but I was wrong((( it turned out to be softer.. and I'm not very comfortable. This is the third mattress I've ordered for myself and again I was wrong..