Vesgantti 24cm Hybrid Mattress with Pocket Spring and Memory Foam for Support & Pressure Relief-Medium Firm,CertiPUR-US Certified

£89.99 £129.99
31%OFF (Save£40.00)
Voucher
An extra £0.00 OFF with code Apply £0.00 voucher
Code:
Discount price: £89.99

Please use the code at checkout.


Vesgantti Mattress 9.4 Inch Pocket Sprung Mattress with Breathable Foam

Vesgantti®Foam and innersprings combine for a firm supportive sleep experience. Wake up minty fresh and well rested.

  • 【Superior Comfort】- The Vesgantti Mattress combines supportive pocket springs and plush memory foam. Each pocket spring works independently to reduce motion transfer, ensuring a restful sleep without disruptions, even if your partner moves.
  • 【Quality Sleep】- With medium firmness, this mattress provides the perfect balance of support and softness. The advanced pocket spring system aligns your body, while high-density memory foam delivers just the right amount of comfort, offering a universally pleasing sleep experience.
  • 【Breathable and Cooling】- Made with premium memory foam and a hybrid spring design, the Vesgantti mattress promotes airflow to keep you cool and dry. Its breathable materials wick away moisture and prevent overheating, creating a comfortable sleep environment.
  • 【Ultra Quiet for Peaceful Sleep】- Equipped with high-quality pocket springs and slow springback foam, the mattress absorbs motion and vibration, reducing disturbances. Enjoy a peaceful night's sleep without waking up from movement or noise, ideal for couples.
  • 【Mattress-in-a-Box】- Delivered vacuum-sealed and rolled for easy transport, the mattress inflates in 10 seconds after unpacking. Please allow up to 72 hours for it to fully expand (once opened, it cannot be rolled back).

Ships FREE, arriving in 3-5 business days

See why customers love the Vesgantti mattress.

Write a review

Write a review

  • {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content | ellipsis }}

    Continue Reading
    {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content }}

    All Reviews

    All Reviews

    {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content }}