Vesgantti Mattress Topper, 7.5/10cm Gel Memory Foam Mattress Topper for Cool Sleep & Back Pain Relief with Washable Cover & Corner Elastic Straps, CertiPUR-US Certified, Grey
Please use the code at checkout.
【Comfort & Support】- Our Vesgantti memory foam mattress topper offers a perfect balance of softness and support. It conforms to your body’s shape, reducing pressure points and providing ultimate comfort. The breathable cover and ventilated foam work together to regulate temperature, keeping you cool and comfortable all night for a deeper, more restful sleep
【Enhanced Cooling Effect】- The 7.5cm memory foam mattress topper is composed of a 3.5cm Gel-infused memory foam layer and a 4cm high-density support foam while the 10cm memory foam mattress topper is composed of a 5cm Gel-infused memory foam layer and a 5cm high-density support foam. When you lie on the mattress topper, the gel absorbs heat from your body and helps to disperse it, providing a cooler sleeping surface. This can significantly improve sleep quality for those who are sensitive to heat
【Breathable & Washable Cover】- The breathable cover allows you to simply take it off and wash it regularly to eliminate stains. This feature is particularly essential for households with children or pets. The machine washable cover helps extend the life of the topper by shielding the topper from sweat and body oils that can degrade the topper material over time
【Rejuvenates Your Mattress & Multi-use】- Our Vesgantti memory foam mattress topper can significantly improve the comfort level of your existing mattress. At the same time, it offers dual firmness options. Easily flip the inner foam layers for two different comfort levels. It’s suitable for sofa bed, guest bed, caravan, college dorm, Tatami, camping and more
【Instructions & Service】- Vacuum sealed and neatly rolled in a box. Smaller size, easy to carry, inflate in 10 seconds after unpacking, please allow up to 24-48 hours to fully expand ( Please note: Once you unwrap the topper, it will expand to its original size and cannot be rolled back again) Vesgantti offers you a 100 night trial and is dedicated to ensuring excellent customer service
