Vesgantti Velvet/Teddy Fleece Armchair with/without Footstool and Lumbar Pillow, Modern Wing Back Accent Chair with Ottoman, Large Cuddle Chair for Living Room Bedroom Study Room Office

£199.99 £299.99
33%OFF (Save£100.00)
Voucher
An extra £50.00 OFF with code Apply £50.00 voucher
Code: £50 OFF
Discount price: £149.99

Please use the code at checkout.

【Easy to Assemble】- For both of the leisure chair and footrest, all you need is just to install the legs and then they are ready for use, which makes it a hassle-free addition to any home. Please flip over the chair and unzip it, you will see the accessories and the manual are inside the seat compartment

【Suitable Size & Uses】- The accent chair: 82D*74W*89H cm, lumbar pillow: 46L*25W cm, cushion: 54D*67W cm. The footstool: 52L*40W*47H cm, cushion: 52L*40W*18H cm. Thanks to its wide and thick resilient cushion, this lounge chair with footrest will provide utmost comfort when you sit on it, the velvet stool can be used as a footrest and a dressing stool as well

【Comfortable Material】- With breathable velvet fabric/teddy fleece, a roomy thick upholstered cushion and a lumbar pillow, filled with pocket spring and high density sponge, Vesgantti living room armchair with footstool looks gorgeous and will complement any home decorations, making you feel extremely comfy when you sit or rest on it

【Versatile in Use】- As it would not take up too much space, this accent chair with ottoman can be placed near your sofa in the living room or next to the window in your bedroom or study room, which will be a beautiful addition to your space. It also applies to the leisure area or office. You are sure to feel great when read or rest on the occasional chair set

【Stable Structure】- Made of wooden base and legs, designed with integral backrest and the seat, this velvet armchair with footstool is sturdy enough and built to last. Furthermore, adjustable anti-skid foot pads could keep this footrest and accent chair stable. The weight capacity of chair is 180kg, and the footstool is 150kg, so no worries about its firmness

Ships FREE, arriving in 3-5 business days

See why customers love the Vesgantti products

Write a review

Write a review

  • {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content | ellipsis }}

    Continue Reading
    {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content }}

    All Reviews

    All Reviews

    {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content }}

    Customer Reviews

    Be the first to write a review
    0%
    (0)
    0%
    (0)
    0%
    (0)
    0%
    (0)
    0%
    (0)