Vesgantti Cube Velvet Ottoman, Decorative Furniture Upholstered Pouffe Footstool
£69.99
Liquid error (snippets/product-form line 139): Computation results in '-Infinity'
(Save£-69.99)
Voucher
An extra £0.00 OFF with code
Apply £0.00 voucher
Code:
Discount price:
£69.99
Please use the code at checkout.
- 【Ready for Use & Save Space】- Save the bothering and trouble of assembly. You will get a compact ottoman, all you need to do is to take it out of the package, and it is ready for use. Size of 17x17x18”, so it would not take up too much space, and can be stored easily in a corner or by the bed when not in use
- 【Unique Stylish Appeal】- Our stool is unique and its design has an artistic appeal. Simple yet stylish, affordable but luxurious. It would be a plus and sparkle to your home decoration. Visitors coming to your house would definitely be attracted to this lovely ottoman and be amazed by your aesthetic taste as well. The velvet upholstery increase classic beauty while standing up to regular use in your home
- 【Versatile in Use】- One ottoman, many uses. This comfy ottoman can be used as an extra seat in your living room, entryway, bedroom, locker room or craft workshop. Amazing pouffes and footstools at the proper height for resting your feet or legs. You can also use it as a small side table/coffee tabletop to put things on. And for photographers and artists, they may find it a useful work of art
- 【Comfortable & Sturdy】- Smooth velvet makes our stool more soft and skin-friendly. With resilient sponge padded seat, this footrest stool looks chic while being comfortable to sit on. Our ottoman has a bearing capacity of 140KG as solid wood frame inside offers firm structure for it. Also the non-slip foot pads which make this small stool safe and not slip over
- 【Durable & Care】- With occasional cleaning and proper maintenance, our footstool can last a lifetime. For long lifespan use, please clean the velvet with dry shampoo and a wet sponge or a mild cleaner. And for your safety, please do not use this stool as a step ladder, or stand on it or jump onto it
