Vesgantti Lightweight Hard Shell 4 Wheel Travel Trolley Luggage Suitcase

£50.00 £80.00
38%OFF (Save£30.00)
Voucher
An extra 10% OFF with code Apply 10% voucher
Code: JUN10
Discount price: £45.00

Please use the code at checkout.

  • ABS + PC material; Lightweight and flexible surface allows 75kg, reduce risk of sudden cracking and high pressure.
  • 【Exterior】L35xW23xH56cm(Height Inc Handles & Wheels); Combination lock supplied;Height adjustable handle; 360°dual spinner wheels; Classic strip shell perfect for comfort professional business traveling.
  • 【Interior】Divider pad & zippered mesh pouch; Elastic ribbons with flexible buckle to keep your belonging tidy and prevent falling.

Approximate External Size
20 Inch: 35 x 23 x 56cm (Inc Handles & Wheels)
Inside Litre Capacity 
20 Inch: 31L 
Weight of each case 
20 Inch: 2.8kg 

Note There is a layer of film on the luggage. If you find some scratches or damage on this film, please don't worry, it is normal. Just remove this film before you use the luggage. This is like you buy a new phone, there is a layer of thin film on the screen. Normally you should remove it while some people like to keep it. It is all up to you.

Ships FREE, arriving in 3-5 business days

See why customers love the Vesgantti products

Write a review

Write a review

  • {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content | ellipsis }}

    Continue Reading
    {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content }}

    All Reviews

    All Reviews

    {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content }}

    Customer Reviews

    Be the first to write a review
    0%
    (0)
    0%
    (0)
    0%
    (0)
    0%
    (0)
    0%
    (0)